Hours vary Jacksonville (904) 699-2626
Strictly Builders Inc
Demolition and Structural Removal Done to Scope

Family-owned · Jacksonville Local

Demolition and Structural Removal Done to Scope

From removing a kitchen bulkhead to full interior teardown, we clear the way for the build.

Free estimate

Tell us what you need

Three fields. It reaches a person here, not a call centre.

No obligation · Responds within 1 business day


By submitting this form you agree that we may contact you about your request and share your details with partner companies for marketing purposes.

Remove a Kitchen Bulkhead the Right Way

Removing a kitchen bulkhead sounds straightforward until you open it up and find a mechanical chase, live wiring, or a soffit that was load-bearing in a way nobody documented. That's where experience actually matters. At Strictly Builders Inc, Ryan Alson has handled selective demolition across a wide range of residential projects over three years in the trade, and he knows the difference between a cosmetic soffit and a structural one before a single cut is made. If you've been told you need to remove a kitchen bulkhead to open up cabinet runs or get flush ceiling height, call us first and we'll assess the structure before the work starts.

Demolition at a professional level isn't wrecking. It's controlled removal. Whether the scope is a single bulkhead, a non-load-bearing partition wall, full bathroom remodeling prep, or a whole-room gut ahead of a complete remodel, the process begins with identifying what can come out and what cannot. Utilities need to be located and isolated. Structural members need to be identified. Debris needs to be managed so the surrounding space stays workable. Cost on a demo job is driven by scope, access, the presence of utilities inside the cavity, and whether any abatement or subfloor repair is required after the teardown. Every job is different -- contact Strictly Builders Inc for an accurate estimate.

Demolition Scope We Handle

Selective removal, full gut-outs, and everything between -- one contractor, no handoffs.

01

Kitchen Bulkhead Removal

Soffits and bulkheads hiding above upper cabinets are often cosmetic, but not always. We open, identify the contents, reroute what needs to move, and remove the framing cleanly so your cabinet installation or ceiling work starts from a true surface.

02

Interior Wall Removal

Non-load-bearing partition walls can come down clean. Load-bearing walls require a temporary support structure and a properly sized header before any framing is cut. We assess before we touch it, and we frame the opening correctly when the wall is gone.

03

Full Room Gut-Out

Bathroom and kitchen remodels often require stripping a room to studs -- tile, drywall, subfloor, fixtures, and all. We gut to the depth the project requires and leave the cavity clean and ready for the subfloor repair or framing phase that follows.

04

Drywall and Ceiling Removal

Damaged, water-stained, or outdated drywall and popcorn ceilings are removed without wrecking adjacent surfaces. If the plan is to follow with new tile work or a paint refresh, we stage the demo so the surrounding finish doesn't become collateral damage.

05

Flooring Demolition

Pulling old tile, carpet, hardwood, or laminate to prep for new flooring installation requires knowing what's underneath. We remove existing material, assess the subfloor condition, and flag any repairs needed before the next floor goes down.

06

Selective Structural Abatement

Some demolition exposes structural issues that weren't visible before -- rotted framing, compromised joists, deteriorated sheathing. We identify it during the teardown phase and address it before the build continues, rather than building over a problem.

How We Approach Every Demo Project

  1. 01

    Assess Before Cutting

    We identify load-bearing conditions, locate utilities inside walls and ceilings, and confirm the full scope of removal before any tool touches the structure. The assessment phase prevents surprises mid-project.

  2. 02

    Controlled Removal

    Demolition proceeds in a sequence that protects what stays. We isolate utilities, protect adjacent finishes, and remove material in the order that keeps the surrounding structure stable throughout the teardown.

  3. 03

    Clean Handoff to the Build

    Demo ends when the space is ready for what comes next -- framing, drywall, flooring, or interior painting. We clear debris and leave the cavity in the condition the next phase requires, not just cleared.

When a Bulkhead Removal Gets Complicated

Not every kitchen soffit is empty -- here's what changes the job.

Kitchen bulkheads were used for decades as a way to box in ductwork, plumbing chases, and electrical runs that didn't have a clean path elsewhere in the framing. Some of them are hollow. A lot of them aren't. The ones hiding active mechanicals require a different approach: utilities get rerouted before framing is cut, not after. If ductwork needs to move, that portion of the HVAC system has to be replanned before the soffit comes down. If there's wiring inside the cavity, it needs to be traced, safely de-energized, and rerouted to code. Skipping that assessment is the primary reason bulkhead removal projects turn into expensive problems for homeowners who thought they were getting a simple job. We've seen it. We don't work that way. The cost of a proper pre-demo evaluation is built into how we quote the job, not billed as a surprise after the drywall is already on the floor.
kitchen bulkhead removal work, professional service in Jacksonville, FL

What We Commit To on Every Demo Job

How Strictly Builders Inc approaches demolition work

Structural assessment before first cut
Load-bearing conditions identified before any framing is touched
Utility isolation and rerouting in scope
Wiring and mechanicals inside cavities addressed before removal
Single contractor from teardown through finish
No subcontractor handoff between demo and the build phase
Available 7 days a week
Monday through Friday around the clock, Saturday 6AM to 6PM, Sunday available

Common Questions

Demolition Questions, Answered Directly

How do I know if my kitchen bulkhead is load-bearing?
You generally can't know from looking at it. Bulkheads can hide structural elements in older construction, particularly in homes where the original framing didn't follow a clean plan. The only reliable method is opening the cavity or reviewing original framing plans if they exist. We assess the structure before any removal starts -- that assessment is part of what we quote.
What's typically inside a kitchen soffit or bulkhead?
Hollow framing is common in newer builds, but older soffits frequently contain supply or return air ducts, electrical junction boxes or wire runs, and occasionally drain or supply lines from a floor above. The contents determine how the removal is sequenced and whether any trade work -- rerouting ductwork, extending electrical -- needs to happen before the framing comes out.
Does removing a wall or bulkhead require a permit in Florida?
Florida building code requires permits for structural work, including removal of load-bearing walls and modifications that affect the building's mechanical or electrical systems. Non-structural partition removal in a straightforward scope often doesn't trigger a permit requirement, but that determination depends on the specific scope of the project. We can walk through what applies to your job before we start.
How is demolition debris handled during a project?
On a contained scope like a single bulkhead or wall, we remove and haul debris as part of the job. On a full gut-out, we stage debris removal so the space stays workable through the teardown phase. We don't leave a client's home full of material at the end of a day. The space is left clean enough that the next phase can begin without a separate cleanup step.
Can you handle the full project after demolition, or just the teardown?
We handle the full project. Strictly Builders Inc doesn't operate as a demolition-only subcontractor. The teardown is the first phase of a remodel or build, and we carry it through to finish -- framing, drywall, tile, flooring, painting. One contractor across the whole scope means the demo is staged correctly for what follows, not cleared in a way that complicates the build phase.
What's the difference between selective demolition and a full gut-out?
Selective demolition removes specific elements while preserving surrounding structure and finishes -- pulling a bulkhead, opening a wall for a pass-through, removing old tile without touching the subfloor. A full gut-out strips a room to its framing and subfloor. The right approach depends on project scope, the condition of what's being preserved, and whether the existing finishes are worth saving.

Areas We Serve

Strictly Builders Inc operates across the greater First Coast region, handling demolition and renovation projects in communities ranging from established neighborhoods with older construction to fast-growing corridors where new builds are the norm.

Ready to Clear the Way for Your Project?

Call Strictly Builders Inc to schedule a demo assessment. We'll identify what can come out, what can't, and give you an accurate picture of the scope before work starts.

Related