Hours vary Jacksonville (904) 699-2626
Strictly Builders Inc
Kitchen Remodeling That Handles Every Detail

Family-owned · Jacksonville Local

Kitchen Remodeling That Handles Every Detail

One contractor, full scope: cabinets, backsplash, tile, drywall, painting, and finish work.

Free estimate

Tell us what you need

Three fields. It reaches a person here, not a call centre.

No obligation · Responds within 1 business day


By submitting this form you agree that we may contact you about your request and share your details with partner companies for marketing purposes.

Kitchen Remodeling From Demo to Final Finish

A kitchen remodel is one of the most involved renovation projects a homeowner can take on, and what separates a project that goes right from one that drags on is having a single contractor who knows every trade in the room. Strictly Builders Inc handles kitchen remodeling from demolition straight through to the final coat of kitchen painting, with the same crew on-site start to finish. Ryan Alson has been doing this work for three years, and the feedback from clients like Lisa Blow says it plainly: high quality, on time, on budget. Call for a free estimate before another contractor talks you into a longer scope than you need.

Kitchen remodels range significantly in cost depending on the size of the space, the condition of the existing structure, the materials you choose, and how much of the layout changes. A basic refresh with new cabinets, backsplash, and paint looks nothing like a full gut-down-to-studs rebuild. What drives cost up: moving plumbing or electrical, replacing subfloor, custom cabinetry, or higher-grade tile and countertop materials. What keeps it in range: keeping the existing layout, choosing mid-grade materials, and working with a contractor who doesn't subcontract every trade out separately. Every job is different, contact Strictly Builders Inc for an accurate estimate.

What a Full Kitchen Remodel Actually Covers

Most kitchens need more than one trade. We bring all of them.

A kitchen isn't a single surface. It's cabinets, walls, floor, ceiling, lighting, backsplash, and trim all sharing the same four-foot clearance. When you hire separate contractors for each, you spend half your time coordinating handoffs and the other half fixing gaps between their scopes. Strictly Builders handles tile flooring installation, backsplash work, drywall, trim work installation, painting, and cabinet installation under one roof. We've done full gut-to-finish kitchens and targeted refreshes. The scope depends on what the space needs, not on what's easiest to sell.
kitchen remodels work, professional service in Jacksonville, FL

SCOPE

Services Included in Kitchen Remodeling

These are the tasks we actually do, not a marketing checklist.

  1. 01

    Cabinet Removal and Installation

    Old cabinets out, new ones in, level and properly anchored. We handle cabinet installation as part of the full remodel scope.

  2. 02

    Backsplash and Tile Work

    Tile layout, cuts, setting, and grouting done right the first time. Lisa Blow's kitchen backsplash is a project we're proud to have our name on.

  3. 03

    Kitchen Painting

    Walls, ceilings, and trim painted after all the hard work is done, so the finish stays clean. See our kitchen painting service for details.

  4. 04

    Flooring and Subfloor

    We assess the subfloor before anything goes down. If it needs leveling or repair, we handle it before the new floor goes in.

PROCESS

How the Kitchen Remodel Process Works

Every kitchen remodel we do follows the same order: demo first, structure next, then surfaces, then finish. Skipping steps is how you end up with a beautiful backsplash on a wall that wasn't properly patched, or new flooring on a subfloor that flexes.

  1. 01

    Demo and Assessment

    We remove what's coming out and check what's behind it: wall condition, subfloor, existing electrical. No surprises once work starts.

  2. 02

    Structure and Surfaces

    Drywall, subfloor repair, cabinet installation, tile, and flooring all go in sequence. Each trade sets up the next one correctly.

  3. 03

    Finish Work and Paint

    Trim, grout sealing, kitchen painting, and final cleanup. We don't leave until the room looks like what we agreed on.

Why One Contractor Changes the Outcome

Most kitchen remodel problems don't come from bad work. They come from handoffs. One contractor patches drywall and leaves. Another comes in a week later to tile, and the patch isn't ready. A third paints over tile adhesive residue that wasn't cleaned. We don't subcontract kitchen remodels out. The crew that does your demo is the crew that tiles your backsplash and paints your walls. That continuity matters more than any single skill in the room. We've been doing this for three years and we're available seven days a week, including weekends, so projects don't stall waiting for the next available slot. For clients in Ponte Vedra Beach or Atlantic Beach, that kind of scheduling flexibility is genuinely rare in this market.
kitchen remodels work, professional service in Jacksonville, FL

Kitchen Remodel Questions, Answered Straight

What is a realistic budget for a kitchen remodel?
Honestly, it depends on how much of the kitchen you're touching and what materials you choose. A backsplash, cabinet refresh, and paint job is a very different number than a full demo-to-finish rebuild with new flooring, drywall, and electrical. Mid-range full remodels in Florida typically run well into five figures once materials, labor, and permits are factored in. Every job is different, contact Strictly Builders Inc for an accurate estimate.
What order do the trades go in during a kitchen remodel?
Demo first, then any structural work like drywall or subfloor repair. Cabinets go in before countertops. Backsplash tile comes after cabinets are set. Flooring can go before or after cabinets depending on the layout and material. Paint is almost always last, after everything that could scratch or chip it is already done. Getting the sequence wrong costs time and money to fix.
What mistakes should I avoid in a kitchen remodel?
The biggest one is not checking what's behind the walls before you commit to a scope. Old drywall, water damage, or a subfloor that's soft in spots can change the project significantly. The second biggest is hiring by price alone. A low bid that doesn't include subfloor repair, proper tile prep, or finish paint is a low bid that will cost more before the project is done.
Can a kitchen backsplash be installed without replacing the cabinets?
Yes. A backsplash installation is its own scope and doesn't require a full cabinet replacement. We've done standalone backsplash work as a targeted refresh when the cabinets are in good shape. The tile needs a properly prepared wall surface, and we'll patch any drywall damage before setting tile, but it doesn't have to be part of a full remodel.
How long does a kitchen remodel typically take?
A targeted refresh, backsplash, paint, and minor updates, can be done in a few days. A full gut-and-rebuild with new cabinets, tile flooring, drywall, and finish work typically runs several weeks depending on material lead times and scope. The projects that run long are the ones where scope changes mid-project or materials weren't ordered before demo started. We talk through both before anything comes out.
Does Strictly Builders Inc handle the demolition as part of the remodel?
Yes. Demo is the first step, and we include it as part of the kitchen remodel scope. Cabinets, tile, flooring, and drywall that are coming out get removed before new work begins. We don't leave that to a separate company, because the demo phase is where you find out what the walls and subfloor actually look like, and we need to be the ones making that assessment.
Does Strictly Builders Inc handle demo as part of a kitchen remodel?
Yes. Demolition is the first step and it's included in the kitchen remodel scope. Cabinets, tile, flooring, and drywall that are coming out get removed before new work begins. We don't leave that to a separate contractor, because the demo phase is where you see what the walls and subfloor actually look like, and we need to be the ones making that call.

Ready to Remodel? Start With a Call.

Strictly Builders Inc handles kitchen remodeling from demo to final finish, with one crew and no subcontracting. Available seven days a week.

Related